Social Housing – Kitchen

Description of the work performed


Essential housing works for social housing and council projects, including void property refurbishment, kitchen fitting and bathroom fitting, delivered on construction sites in line with housing and site requirements.

Kitchen Refurbishment
  • Removal of existing kitchen (where required)
  • Full preparation of walls, ceilings and floors
  • Installation of kitchen units
  • Worktop preparation and cut-outs (non-stone)
  • Wall and floor tiling
  • Full plumbing works (water, waste, appliances)
  • Electrical works where required (via certified electrician)
  • Plastering, making good and finishing
  • Painting and decorating
  • Floor finishes (vinyl / linoleum as required)
Bathroom Refurbishment
  • Removal of existing bathroom
  • Preparation of walls, ceilings and floors
  • Installation of bath, shower, basin and WC
  • Waterproofing / tanking prior to tiling
  • Wall and floor tiling
  • Full plumbing works
  • Electrical works where required (via certified electrician)
  • Plastering, making good and finishing
  • Painting and decorating
  • Floor finishes (vinyl / linoleum as required)


Void Property Refurbishment
  • Full internal strip-out (where required)
  • Preparation of walls, ceilings and floors
  • Plastering and making good
  • Painting and decorating throughout
  • Electrical works where required (via certified electrician)
  • Plumbing works
  • Floor finishes (vinyl / linoleum)
  • Plastering, making good and finishing
  • Painting and decorating
  • Floor finishes (vinyl / linoleum as required)
  • Silicone, final detailing and handover
Site Compliance
  • All tools 110V
  • 110V transformer and extension leads
  • Dust extraction – M-Class
  • Public Liability Insurance – £5,000,000
  • Personal transport – van
  • PPE worn on site